Installing Upgrading Designing Configuring Deploying Monitoring Administering Troubleshooting Reference JBI Components
Close Print View
Upgrading: About eTL Project Migration
 

Classic Java CAPS

Upgrading to Java CAPS 6

Upgrading to Sun Master Index

JBI Based Components

Migrating From eTL to Sun Data Integrator

About Migration to Sun Data Integrator

About eTL Project Migration

About Using Migrated eTL Components in Java CAPS 6

About Runtime eTL Components

Uploading the eTLMigrationTool SAR File to a Repository

To Upload the eTLMigrationTool SAR File

Importing eTL Projects Into Java CAPS 6

To Import an eTL Project

Building Data Integrator Projects

To Build a Data Integrator Project

Creating, Configuring, and Building BPEL 2.0 Modules for Data Integrator

To Use the Data Integrator Web Service in a BPEL 2.0 Module

Configuring Repository-based Projects to Use Data Integrator

To Use the Data Integrator Web Service in a BPEL 1.0 Module

Using Data Integrator Components as JBI Modules in Composite Applications

To Use the Data Integrator Web Service in a BPEL 2.0 Module

About eTL Project Migration

In Java CAPS 5.1.x, projects are saved as ZIP files that can be imported into Java CAPS 6. Individual eTL components can only be used in Data Integrator after the entire project has been imported.

Because Java CAPS 5.1.x is exclusively repository-based, you must install and start a repository before you can migrate eTL projects into Java CAPS 6. Also, a special tool called the eTL Migration Tool (eTLMigrationTool.sar) must be uploaded to the repository. If this tool has not been uploaded, then 5.1.x projects that contain eTL components cannot be imported into Java CAPS 6.

Importing a 5.1.x project that contains eTL components has the following results.