|
Table of Contents
- Basic Test Phase
- Functional Test Phase
- PCI Card Test Procedures
- Revision History
- Reference Documents
- Features to Be Tested
- Features Not Guaranteed to be Tested
Each IHV in the program is assigned to a Market Development Engineer who will work with the IHV to enable and schedule the PCI product testing. The necessary steps include:
-
Getting a working card and driver for testing
-
Providing the test engineer with a test plan and appropriate instructions
-
Reviewing and signing off on the test results provided by the test engineer
-
Posting the test results to Sun's external web site for each card/driver verified. The posting includes platforms and Solaris revisions used during testing.
|